Course‑Contest · Guest country: Italy

CanSat World Contest 2027

Design, build and launch your Self-Propelled Ground Displacement CanSat (DeTerrA): a rover that must survive the drop, protect its crew member (a chicken egg), send telemetry and drive autonomously to its ground station.

Registration: September 25 – November 13, 2026 extended · Mexico City

Mission Guide (available Sep 25) Registration Form Press Kit (coming soon)

Countdown

Registration opens in:

00Days
00Hours
00Minutes
00Seconds

Mexico City time (UTC−06:00).

The 2027 mission

DeTerrA Canned Satellite

For this edition, the CanSat World Contest goes one step beyond the classic CanSat: it adds a mobile robotic system, the Self-Propelled Ground Displacement CanSat (DeTerrA). After being released in free fall, the satellite must protect its crew member (a chicken egg), send telemetry in real time and drive autonomously to its ground station.

This new format simulates real robotic surface-exploration scenarios, in which ground vehicles carry, deploy and operate scientific instruments.

30–50 mRelease height
180 sMax. time to reach the ground station
900 gMaximum mass (excluding the egg)

Calendar

Important dates

All times are Mexico City time (UTC−06:00). No document will be accepted after its deadline.

  1. Sep 25 – Nov 13, 2026

    Registration extended

    From Friday, September 25 (9:00 AM) to Friday, November 13, 2026 (11:59 PM). The original deadline was November 6.

  2. Nov 16, 2026 – Jan 2, 2027

    Stage 1 · Conceptual Design Review (CoDR)

    From Monday, November 16, 2026 (9:00 AM) to Saturday, January 2, 2027 (11:59 PM).

  3. Jan 11 – Feb 5, 2027

    Stage 2 · Preliminary Design Review (PDR)

    From Monday, January 11 (9:00 AM) to Friday, February 5, 2027 (11:59 PM).

  4. Feb 15 – Mar 12, 2027

    Stage 3 · Critical Design Review (CDR)

    From Monday, February 15 to Friday, March 12, 2027 (11:59 PM).

  5. Mar 22 – Apr 2, 2027

    Stage 4 · Acceptance Tests

    From Monday, March 22 to Friday, April 2, 2027 (11:59 PM). Video, maximum 2:30 minutes.

  6. Apr 30, 2027

    RAM I submission (Phase A)

    Saturday, April 30, 2027, 6:00 PM.

  7. May 22, 2027

    Stage 5 · Certification and Launch

    Saturday, May 22, 2027, at Ciudad Universitaria. RAM II (Phase B) submission the same day, 7:00 PM.

  8. May 24, 2027

    Results

    The top ten teams will be announced through PEU’s social media.

  9. May 24, 2027

    Awards Ceremony

    Monday, May 24, 2027, 9:00 AM, at UNAM’s facilities.

From the Mission Guide

Recommendations

Before you start designing your DeTerrA canned satellite, keep in mind these recommendations from the CanSat World Contest 2027 Mission Guide:

  • Design with impact in mind. The satellite must survive a free fall and keep its critical functions afterwards. An unbroken structure is not enough: the electronics, battery, rover, communications and power switch must all keep working after the impact.
  • Watch mass, volume and center of mass. Check often that the satellite meets the maximum dimensions, the allowed mass and the required center-of-mass position. Don’t wait until certification to verify them.
  • Make the master switch reliable. The on/off system must be reachable without removing components or using tools. This prevents battery drain and makes pre-launch operation easier.
  • Plan your power system carefully. Size the battery for sensors, processing, communications, rover mobility and, if you attempt it, video transmission. Leave enough margin for waiting time, delays, tests and the full operation.
  • Protect connections and components. The impact can disconnect cables, sensors, antennas, batteries or switches. Use proper mechanical fastening, secure connectors, strain relief and a tidy internal layout.
  • Test communications ahead of time. Check range, frequency, transmission stability, interference, antenna orientation and data reception at the ground station. Document the technology you use and have alternatives in case of interference.
  • Don’t rely on a single successful test. A test that works once does not prove the system is reliable. Repeat tests, document the results and look for failure patterns before you call a subsystem validated.
  • Design for inspection and repair during development. The satellite cannot be modified after certification, but during development you must be able to reach key components, check connections, charge the battery, replace damaged parts and make controlled adjustments.

Support material

References

Technical documents from previous editions and manuals to help you prepare your deliverables.

Contact

Ready to launch your team?

Write to us if you have questions about registration, the Mission Guide, or any stage of the contest.